Specifications
Vehicle System Disassembly & Assembly 27
NOTICE
When the correct amount of shim has been installed
behind rollers (1) there will be contact (zero clearance)
between the rollers and the inner mast at most narrow
point of mast (refer to step 4)
6. Install 1 mm shim to each bearing of intermediate
lower and stationary upper basically. Lifting by crane,
insert intermediate mast into stationary mast from
the upper side.
NOTE: When installing shims (5) behind bearings (4),
make sure the amount of shim is divided equally when
positioned behind each bearing (4).
Mast Adjustment Lower Bearings
(A) Zero clearance. (B) Minimum clearance. (C) Zero clearance.
(3) Bearing. (4) Bearing. (5) Shims. (6) Shims.
7. Make sure intermediate mast lower bearings are
properly shimmed in the stationary mast by rolling
up and down and moving intermediate mast to right
and left. If clearance between both masts can be
detected, pull out the intermediate mast from the
stationary mast with crane and add shim 0.5 mm or
1 mm to both intermediate lower bearings.
IDCS123S
C
B
A
3
4
5 6
IDCD039P
IDCD033P
IDCD037P
1
2