Specifications
Vehicle System Disassembly & Assembly 13
4. Remove two bolts (9) from the hose mounting
bracket. Set the hoses aside. Remove two nuts (10)
from the chain anchors. Set the chains aside, clear
from the mast.
5. Use tool (A) to remove retainer ring (11) from the
cross head shaft.
6. Remove cross head (12) from the shaft.
7. Raise the inner mast to pull out carriage as shown.
8. Remove carriage from bottom of inner mast (15).
Carriage (14) weighs approximately 116kg (255 lb).
NOTE: Use the following steps to install the carriage.
9. Raise the inner mast to put in the carriage onto the
mast, and lower the inner mast to cover carriage
(1) bearing fully.
10. Install cross head (12) and retaining ring (11).
11. Put the chains in position over cross head (12).
Install nuts (9) onto the chain anchors to a torque
of 270 ± 40 N·m (200 ± 30 lb·ft).
Install bolts (10) onto the hose mounting bracket.
IDCD008P
11
12
IDCD010P
14
15
10
IDCD008
11
12
9