Instructions / Assembly

Main engine installation
Dismantle the plastic housing on the main engine before installation. Keep its fasteners handy.
The detachable mounting base should be assembled first as shown in Figure 5:
Assemble the machine engine to the mounting base as shown in Figure 6:
Figure 6
Prepare the power line to connect the mounting plate and main engine. The number of power supply cable core should not be less
than 3 pcs, the sectional area of the cable core should not be less than 1.5 mm², and the length should be determined by the installers
according to the situation at the installation site.
Unlock the main engine before installation: Take out the key cover; insert the key, and open the manual release bar till it rotates by 90°
as shown in Figure 7. Then turn the output sprocket, which should rotate easily.
Figure 7
6
Flat washerφ6
Figure 5
Spring washerφ6
Nut M6
Horizontal mounting plate
Vertical mounting platen
Inner hexagon screw M6×20
Nut M8
Spring washerφ8
Flat washerφ8
Hexagon screw M8×25
Mounting base
Turn on 90°