Users Manual
6
The Echelon
®
NOTE: Standard installation height is 62" to the top of the wall mount.
6. Drive in the wood screws with
washers into predrilled holes.
5. Push all toggle bolts into drywall
and tighten down. Make sure the
two center drill holes are visible and
the bracket is level.
3. Mark all six holes. Using a 1/8 drill bit,
drill the two pilot holes into the stud
for the wood screws. Using a 5/8 drill
bit, drill the holes for the toggle bolts.
* Ensure that you press hard enough to leave
a hole in the drywall behind the template.
4. Place the bolts with washer through
the wall mount and attach the
toggles to bolt as shown above.
2. Locate stud within the wall you
mark with a pencil. Level and tape
wall mount template with middle
two cross marks centered over
stud mark.
1. On the wall, measure down 7" from
the tip of your nose. Place the top of
the wall mount level to this point.
INSTALLING THE MOUNT
6
TEMPLATE
TEMPLATE
TIP OF THE NOSE MARK
STUD MARKS
TEMPLATE