GENERAL SAFETY REQUIREMENTS
The dust collector should be used only when it is in a technically
acceptable condition. Regular maintenance, as set out in this manual,
is required to minimise technical failure. Third party supplied
components (for example motors) should be maintained according to
the manufacturer's instructions.
You should ensure any persons carrying out work on the supplied
equipment follow any relevant recognised standards/codes and are
competent to do so. Areas requiring a competent person include:
G
Maintenance on any component identified as a potential ignition
source.
G
Lifting and erection.
G
Electrical installation, inspection and maintenance work.
G
Pneumatic installation, inspection and maintenance work.
G
Any access to internal classified potentially explosive atmospheres
where there may be a risk due to explosion.
During assembly/installation or dismantling of equipment, potential
ignition sources may occur that were not considered in the risk
assessment of the unit in operation (for example, grinding, welding
sparks, etc.)
You should use the dust collector in full accordance with the conditions
set out in the Order Acknowledgment and relevant Scope of Delivery.
Failure to do so may compromise product reliability, warranty and safety.
The Scope of Delivery is an integral part of the manual.
Other items of equipment, not supplied under the Scope of Delivery
from Donaldson, should be installed, operated and maintained
according to the documentation supplied with the respective equipment.
Any modification carried out on the 'as supplied' equipment may reduce
reliability and safety, and will nullify warranty; such actions fall outside
the responsibility of the original supplier.
Where necessary for safety, the dust collector is fitted with fixed guards.
Removal of these guards and any subsequent work should only be
carried out after adequate precaution is taken to ensure it is safe to do
so. All guards should be refitted before re-energising.