User manual
6
SANITATION SYSTEM COMPONENTS
*
*
*
*
* Optional SeaLand components
MAINTENANCE SCHEDULE
Maintenance intervals and normal parts replacement vary widely depending on numerous factors such as frequency
of system use, quality of ushing water, etc. The following chart is intended strictly as a general guide in keeping the
sanitation system 100% ready for any conditions of use.
Maintenance Procedure
Recommended
Date of Service
Parts Required
Toilet ush ball seal cleaning
Tighten toilet seat mounting
hardware
Monthly
Monthly (or as needed)
SeaLand Toilet Bowl Cleaner
N/A
ROUTINE MAINTENANCE
Replace duckbill valves in vacu-
um pump or vacuum generator
Replace ush ball seal and ush
ball (if needed)
Every three years
Every three years
Duckbill Valve Kit
Flush Ball Seal Kit
Flush Ball
MAJOR SYSTEM MAINTENANCE
ON-BOARD SPARE PARTS
It is recommended that the following parts be kept on board at all times:
Description
Part Number
Quantity Where Used
Flush Ball Seal
Flush Ball
Water Valve
Vacuum Breaker Kit
Vacuum Switch Kit
1.5-inch Duckbill Valve Kit
(2 ea. per kit)
see parts list
see parts list
see parts list
see parts list
see parts list
see parts list
1
1
1
1
1
1
3600 Series Toilet
Vacuum Generating System