User manual

6
SANITATION SYSTEM COMPONENTS
*
*
*
*
* Optional SeaLand components
MAINTENANCE SCHEDULE
Maintenance intervals and normal parts replacement vary widely depending on numerous factors such as frequency
of system use, quality of ushing water, etc. The following chart is intended strictly as a general guide in keeping the
sanitation system 100% ready for any conditions of use.
Maintenance Procedure
Recommended
Date of Service
Parts Required
Toilet ush ball seal cleaning
Tighten toilet seat mounting
hardware
Monthly
Monthly (or as needed)
SeaLand Toilet Bowl Cleaner
N/A
ROUTINE MAINTENANCE
Replace duckbill valves in vacu-
um pump or vacuum generator
Replace ush ball seal and ush
ball (if needed)
Every three years
Every three years
Duckbill Valve Kit
Flush Ball Seal Kit
Flush Ball
MAJOR SYSTEM MAINTENANCE
ON-BOARD SPARE PARTS
It is recommended that the following parts be kept on board at all times:
Description
Part Number
Quantity Where Used
Flush Ball Seal
Flush Ball
Water Valve
Vacuum Breaker Kit
Vacuum Switch Kit
1.5-inch Duckbill Valve Kit
(2 ea. per kit)
see parts list
see parts list
see parts list
see parts list
see parts list
see parts list
1
1
1
1
1
1
3600 Series Toilet
Vacuum Generating System