Installation Guide
AU
Installation IBIS4
20
See fig. h
A
➤ Tighten the screws using a torque spanner and a fastening torque of
2.5 Nm ±0.3 Nm.
Communication cable
➤ Connect the communication 4 pin plug into the socket on the side of the
display (2) in the ADB.
➤ Ensure the cable is located into the small opening away from the filter area.
➤ Secure excess cable into the holders.
➤ Push the filter back fully in.
See fig. i
➤ Clip the centre cover to the ADB.
The installation is now completed. Connect to the power and test.
NOTICE! Risk of damage
Tighten to the specified torque. Do not overtighten!
A
2.5±0.3 Nm
h
click
click
i
IBIS4-A4--I.book Seite 20 Mittwoch, 13. März 2019 9:43 21