Installation Guide
EN
CT4000 Installing the toilet
15
Installing the control and operating panel of the CT 4050 toilet
Install the control and operating panel in the wall in the immediate vicinity of the toilet
at an easily accessible location.
➤ Use a copy of the 1:1 scale template (fig. a) to make the wall cutout.
a
CT4000-I-AUS.book Seite 15 Dienstag, 6. März 2018 1:18 13