Specifications
14
579 & 595 Installation Instructions
3. Mount the relay box laying on its side to the front
flange of the ceiling template with blunt self-tapping
screws. See FIG. 27.
4. Start each mounting bolt through the ceiling tem-
plate and up into the unit base pan by hand. Evenly
tighten mounting bolts to compress gasket to
1/2" this will be a torque of 40 - 50 inch pounds.
Disconnect the positive (+) 12 volt DC termi-
nal at the supply battery. Damage to equip-
ment could occur if the 12 volt DC is not shut
off.
CAUTION
5. Use Aluminum foil tape (not supplied) to seal the
ends of the foam divider to the sides of the opening.
Make sure the area behind the flange on the ceiling
template is sealed. See FIG. 28.
Note: If solar panel is installed see instructions packaged
with solar panel option.
Note: If using the Genesis Air Filtration System steps "a"
and "b" are to be completed when installing the decorative
cover.
a. Connect the previously run 12 VDC to the red
and black wires protruding from the units return
air opening. Connect +12 VDC to the red wire;
–12 VDC to the black wire. (Do not connect
wires if using the 3308120 Genesis Air Filtration
System Return Air Kit.) See Section I Decora-
tive Cover Installation (Installing unit with 3308120
Genesis Filtration System Return Air Kit).
b. Connect the previously run furnace thermostat
wires (if applicable) to the blue/white wires
protruding from the units return air opening. The
polarity of these connections does not matter.
c. Connect the receiver flat four conductor receiver
cable previously terminated (see Section E-2.
Receiver cable) into one of the receiver leads out
of the air conditioner. Either one of the two (2)
receiver cables can be used.
d. Insert the receiver cable into the receiver and
mount it in the desired location. See FIG. 8A,
8B, 8C and 30.
Furnace
Timer
Unit On
Unit
On
Cool
Heat
Connect The
RJ-11-6C4P
Plug To
Receiver
FIG. 30
Mount With Two
Screws
Receiver
Point Towards
Rear Or Front
Of Vehicle
FIG. 27
Mount Control Box
Laying On Its Side To
The Flange On Top Of
Ceiling Template
Control Box
Three
Screws
Vehicle
Front
FIG. 28
Use Aluminum Foil Tape To Seal the
Foam Divider To The Sides of 14-1/4"
x 14-1/4" (±1/8") Ceiling Opening
Make Sure To Seal
Behind Flange
Route wires
through Slot
Catch Flange In Groove Of
Return Air Cover
AC Power
Supply
Pull Electrical
Cord Down
Roof
Gasket
FIG. 29
DC Power
Supply
Receiver
Leads
Furnace
Furnace
Tstat Con-
nection
From A/C
If bolts are left loose there may not be ad-
equate roof seal or if over tightened, damage
may occur to the air conditioner base or ceil-
ing template. Tighten to specifications listed
in this manual.
CAUTION
H. Wiring The System
Reach up into the return air opening and pull the re-
maining wires down. See FIG. 29.
1. Connection Of Low Voltage Wires










