Specifications

ENGLISH20
DOMETIC HVAC SYSTEM TO FTL CASCADIA – INVERTER/CHARGER, SHOREPOWER, AND ALTERNA-
TOR REGULATOR
Battery-Powered Systems Installation Guidelines
Alternator
Battery 1
Battery 2
Battery 3
-
+
+
-
+
-
+
-
HVAC Unit
Dometic Environmental
Dometic HVAC System to FTL
Cascadia. Inverter/charger,
shorepower, and alternator.
NOTES:
1) House Batteries must be of the AGM deep cycle type
2) Alternator shall be upgraded. Discuss with Dometic
Applications Department for recommendation.
3) Inverter must be of approved type by Dometic in order
to insure proper operation of system.
4) Cable size is choosen based on voltage drop and
load. All cables shall be 2/0 unless otherwise noted
on drawing.
-
Battery 5
Battery 6
+
-
-
+
Battery 7
+
Overcurrent
Protection
120VAC Line
DC Wiring
AC Wiring
Shorepower Inlet
Y-Cord Splitter
to GFCI Receptacle
Cab Power
Outlet
Inverter with Shorepower Pass-Thru
Capability OR Inverter/charger
Battery 4
+
-
+
-
Battery 8
Primary (OEM) BOX
SECONDARY BOX
2/0 Connector
Cables
OEM
Battery
Disconnect
Switch
OEM Fuse
Block
To intake
grid heater
Remove
factory
wires from
alternator.
Splice together,
insulate, and tie
up out of the way
.
Starter
Add at least
a 3/0 positive
cable fromthe
alternator to the
positive starter
stud. 3/8" post at
alterntor, 1/2" post
at starter.
-
+
+
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
<INSERT COMPANY NAME HERE>. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
<INSERT COMPANY NAME HERE> IS
PROHIBITED.
PROPRIETARY AND CONFIDENTIAL
NEXT ASSY
USED ON
APPLICATION
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL
ANGULAR: MACH
BEND
TWO PLACE DECIMAL
THREE PLACE DECIMAL
INTERPRET GEOMETRIC
TOLERANCING PER:
MATERIAL
FINISH
DRAWN
CHECKED
ENG APPR.
MFG APPR.
Q.A.
COMMENTS:
DATE
NAME
TITLE:
SIZE
B
DWG. NO.
REV
WEIGHT:
SCALE: 1:1
UNLESS OTHERWISE SPECIFIED:
B
KEA
9/29/08
SHEET 1 OF 1
Battery 7
DO NOT SCALE DRAWING