Manual

9. ATTACH DUCT TO UN
I
T
- Raise the brace assembly and slip the
extension duct over the outside
diameter of the spigot underneath the
rooftop unit. (Fig 11 & 12).
When attaching the duct to
the unit take care to ensure
i
t
forms a tight, unbroken sea
l
that doesnt allow discharge air to
es
c
ape
.
- Engage and tighten the four M8 bolts
with the threaded inserts in the rooftop
unit.
- Recommended tightening torque of
the bolts is 7 N.m (5.2 lb-ft). As a rough
guide the bolts should be tightened so
that the unit compresses the roof seal
gasket to approximately half its height.
- As the bolts are tightened ensure that
the hold down bars slot into their
recesses in the brace (Fig 12).
Fig 11: Raise the duct assembly up to the roof hole, ensuring the paper extension duct work
forms a tight fit around the spigot underneath the unit.
Ensure hold down bars
engage in recess
Fig 12: Then engage the four M8 bolts, taking care to ensure the hold down bars slot into their
recesses
10. ATTACH PLENUM
C
O
V
ER
- Connect the main cover of the plenum to
the duct by attaching the blue suspension
cord to the lug on the inside of the cover
(Fig 13). Reach into the unit, grab the
control cable plug and pull down to
-This will allow you to use two hands to
connect the control cable (see Fig 14).
- Connect the key pad control cables
together (see below). Be sure that the plug
joins the corresponding wire colours
together (yellow to yellow, red to red etc.)
Fig 13: Shows the positioning of the lug inside the plenum
cover
d
i
sp
l
ay
Failure to properly plug the
control cables together
c
orre
c
t
l
y
will result in loss of power to
Pull the suspension cord down from inside the unit and
hook it through the lug shown inside the plenum housing.
This will allow two free hands to connect the control cables
together.