User`s guide
22 | Dome CXtra
2 In the Log interval section, enter a time interval and starting time
for the first daily test in the hours starting at field. RightLight logs
the first set of conformance tests at the time specified and at
regular intervals thereafter until the end of the day.
Enter a positive integer for hours and a time in the 24-hour format,
such as 13:30. This interval specifies how often the system logs the
results of the selected test(s).
When a selected test fails, a message appears and the Dome CXtra
icon changes to indicate a warning state. View the test results in the
Reporting History log.
NOTE: The log interval and start time must apply to all displays.
These fields are not enabled unless all displays are selected.
Manual Alerts tab
Specify the conformance tests that you want to complete manually.
For each manual test that you select, you can specify a threshold
value that defines a test failure. When a failure occurs, the Dome
CXtra icon is set to a warning state. In addition, if the Enterprise
Management service is installed, an alert is sent to the Dome
Dashboard or SNMP console application. Selections made on this tab
determine operating parameters for the Conformance Wizard, which
guides manual tests.