Installation Guide
DOLLE USA
1200 Mendelssohn Ave. No., Suite 140
Minneapolis, MN 55427
763-746-7830 763-746-7835 fax
5
90° corner for tube or cable (PA25) can be installed from post to
post in the fittings provided, to finish corners. Loosen set screws on fittings and install in
the same manner as steel tubes. Tighten set screws securely. When using cable, after
installing, thread cable through corners, and continue cable to next post.
Acrylic glass is installed with glass post brackets (PA32), sold
separately. Acrylic glass cannot be installed on stairs. Use the drilling template (PA32),
sold separately, for mistake free bracket mounting locations. Remove the supplied fittings
from the post, and install chrome cap screws (supplied with brackets) into fitting holes.
Important: Install glass panels onto posts before you mount posts. Posts are required to be
set at 1 meter on center for acrylic panels. Keep protective film on until installation is
complete.
Drilling template for acrylic glass (PA33) slides onto posts for
mistake free hole locations. Remove fittings from posts. On flat surface, lay out acrylic
panels. Using existing holes in post, line up bracket holes in acrylic glass panel with post.
Using a set screw from post fittings, secure drilling template to post. Important: Use care
when drilling. Hole must be straight through post for proper bracket installation. You will
need to remove and flip drilling template during drilling process to properly line up all
holes. A 5/16” metal drill bit is required. (Not supplied.)







