Installation Guide

DOLLE USA
1200 Mendelssohn Ave. No., Suite 140
Minneapolis, MN 55427
763-746-7830 763-746-7835 fax
2
2. Top Mount Posts
Top Mount Posts (PA1) can be used with any of the PROVA
in fills. (Acrylic glass, stainless steel cable, or stainless steel tubes.) Always use all of the
provided mounting screw holes. Never cut or drill new holes in your post base. For
uneven surfaces, use the post levelor (PA14, sold separately). Set posts no more than 4’
on center.
3. Side Mount Posts
Side Mount Posts (PA2) can be used with any of the PROVA
in fills. (Acrylic glass, stainless steel cable, or stainless steel tubes.) Always use all of the
provided mounting screw holes. Never cut or drill new holes in your post base. For
uneven surfaces, use the post levelor (PA14, sold separately). For stair treads that extend,
use the spacers (1 7/8” PA12 or 2 7/8” PA13, sold separately). Set posts no more than 4’
on center.
4. In Fills
Stainless Steel Cable (PA29) can be secured to your posts with
PA26 Cable Post Adjustment Terminals, or to your wall with PA27 Cable Wall
Adjustment Terminals, sold separately. Install cable sleeves provided with your cable
into the post fittings. Then thread cable through, from post to post. Cut cables with an
angle grinder or heavy duty cable snips. Insert your cable ends into terminals, and tighten
set screws securely. Install handrails prior to installing cables. This will allow less post
movement when tensioning the cable. When installing your cable, loosen the adjustment