Technical data

Rexroth IndraDyn T Operating Torque Motors 12-3
DOK-MOTOR*-MBT********-PR03-EN-P
12.3 General Preconditions
The following preconditions must be provided for successful
commissioning.
Adherence to the safety regulations and notes.
Check of electrical and mechanical components for safe functioning.
Availability and supply of required tools.
Adherence to the commissioning procedure described in the following.
Check of All Electrical and Mechanical Components
Carry out a check of all electrical and mechanical components before
commissioning. Heed the following points in particular:
Ensured safety of personnel and machine
Proper installation of the motor
Correct power connection of the motor
Correct connection of the encoder system
Functioning of available limit switch, door switch, etc.
Proper functioning of the emergency stop chain.
Machine construction (mechanical installation) in proper and complete
condition.
Correct connection and functioning of the motor cooling system.
Proper connection and functioning of the drive control unit.
WARNING
Mortal danger, serious injury or damage due to
failure or malfunction of mechanical or
electrical components!
Troubleshoot mechanical or electrical components
before continuing with commissioning.
WARNING
Risk of injury or mortal danger, as well as
damage due to non-adherence to warnings and
safety notes!
Heed the warning and safety notes.
Commissioning must to be carried out by skilled
personnel
Heed the commissioning procedure described in the
following.