User Guide
Table Of Contents
- 1. Security Precautions
- 2. Introduction
- 3. Hardware Installation
- 4. Electrical Specifications
- 5. Installation and Commissioning
- 5.1 Installing Software
- 5.2 Connecting Power Supply
- 5.3 Connecting Emergency Stop Switch
- 5.4 Connecting External Cables
- 5.5 System Commissioning
- 6. Operation
- 7. Maintenance
Dobot M1 User Guide 7 Maintenance
Issue V1.0.4 (2018-08-30) User Guide Copyright © Yuejiang Technology Co., Ltd
92
It can be put into use after installation.
Greasing Guide Rail of Z-axis
If the guide rail is used without grease, the guide rail will be worn down and the service life
will be reduced. You need to grease the guide rail every two weeks for long service.
Prerequisites
Please prepare the correct-size syringe (a diameter of no more than 2cm) and needle to ensure
that the syringe can touch the guide rail of Z-axis.
Procedure
After 15 minutes, restart Dobot M1 to put it into use.
Figure 7.2 Guide rail of Z-axis
Maintenance of Electrical Parts