User Guide
Table Of Contents
- 1. Security Precautions
- 2. Introduction
- 3. Hardware Installation
- 4. Electrical Specifications
- 5. Installation and Commissioning
- 5.1 Installing Software
- 5.2 Connecting Power Supply
- 5.3 Connecting Emergency Stop Switch
- 5.4 Connecting External Cables
- 5.5 System Commissioning
- 6. Operation
- 7. Maintenance
Dobot M1 User Guide 5 Installation and Commissioning
Issue V1.0.4 (2018-08-30) User Guide Copyright © Yuejiang Technology Co., Ltd
51
NOTICE
Only Dobot M1 of which SN number is DT2018xxx has installed the homing switch.
You can view the SN number on the Help > About M1Studio page.
xxx indicates the random number, please replace it based on site requirements.
Prerequisites
Dobot M1 has been powered on.
Dobot M1 has been connected to a PC successfully.
Dobot M1 has been connected to an emergency stop switch.
Procedure
Please select Tools > Home on the M1Studio page, and Dobot M1 will move automatically
according to the following steppes.
Figure 5.20 Homing point