Specifications
Confidential Page 37 9/26/2010
Satellite
• All dishes must be assembled in compliance with the manufacturer’s
instructions.
• Dishes must be anchored using the Ballast Requirements described in section 4,
page 44.
• Dishes must be grounded to suitable building earth ground rod as per Section
810 of the National Electrical Code.
• Antenna cable must never enter the building through a horizontal surface such
as the roof. Existing conduit or cable access tubes may be used. If new roof
penetration is required, work must be performed be a qualified roof contractor.
• If a new hole into the building must be made, it should be made through a wall
and closed with weatherproofing caulking.
• Care must be taken when assembling the dish to ensure no penetration of the
roof membrane.
• All dishes must have a DMX logo decal applied in the field if not done at the
factory.
• Signal strength and date of alignment is to be noted on back of dish after
installation and following all service.