Specifications
Confidential Page 34
Equipment Placement
• All equipment is to be located as specified on the plans provided by DMX.
• Head end equipment shall be installed in a safe and secure permanent location.
• No equipment shall be placed directly on top of a DMX source player for proper
ventilation (at least 1” clearance).
• Volume control height must be between 4’ to 5’ if mounted to walls, unless
otherwise specified by DMX. Whenever possible, volume controls must be
recessed into walls.
• Wall plates are to be installed straight and plumb with appropriate backing.
• All volume controls are to be mounted at the same height unless specified
otherwise by DMX.