Installation Instructions
Installing DMX AG™
DMX AG™ Foundation Guide: Version 4.3
Updated: September 9, 2014 (clarifications only denoted by ᵠ)
12
Service Entrances (Service Penetrations Must be Sealed through Membrane)
Follow this procedure whenever there are penetrations in the foundation for
services (gas, hydro, water and so on).
1.
Caulk around the service that is penetrating the foundation.
2.
Cut the membrane vertically so that it goes PAST the service at least 6
inches (15 cm).
Cut Line
6” (15 cm)
Center of Service
The DMX AG™ extends 6 inches (15 cm) past the
pipe penetrating this foundation.
Cut here to allow
fitting the DMX
AG™ around the
pipe.
Provide full bead of sealant
at overlap interface*
Field Notes and Dimensions










