Installation Instructions

6
DMX AG Foundation Guide: Version 4.3
Updated: Updated September 9, 2014 (clarifications only denoted by )
Installing DMX AG
1.
Snap a chalk line one inch below grade level on the foundation wall.
2.
Roll out a small amount of DMX AG with the flat tab lining up with the chalk
line. Keep the membrane as smooth as possible. The dimples (bumps) are
placed against the wall as shown below:
This is a dimple. Place
it against a foundation
wall.
We recommend that two people install the DMX AG one to unroll
and smooth out the DMX AG and one to attach it to the foundation.
3.
Secure the membrane to the foundation wall with DMX Washers or DMX
Quick Clips* and concrete nails. Please note, steel washers are not
recommended but if used in the dimpled section of membrane, even if they
are installed with a rubber or PVC insert they may compromise the
membrane and are not covered under warranty*
.