Installation Instructions
Installing DMX AG™
6
DMX AG™ Foundation Guide: Version 4.3
Updated: Updated September 9, 2014 (clarifications only denoted by ᵠ)
Installing DMX AG™
1.
Snap a chalk line one inch below grade level on the foundation wall.
2.
Roll out a small amount of DMX AG™ with the flat tab lining up with the chalk
line. Keep the membrane as smooth as possible. The dimples (bumps) are
placed against the wall as shown below:
This is a dimple. Place
it against a foundation
wall.
We recommend that two people install the DMX AG™ – one to unroll
and smooth out the DMX AG™ and one to attach it to the foundation.
3.
Secure the membrane to the foundation wall with DMX Washers™ or DMX
Quick Clips* and concrete nails. Please note, steel washers are not
recommended but if used in the dimpled section of membrane, even if they
are installed with a rubber or PVC insert they may compromise the
membrane and are not covered under warranty*
.










