Specifications
© 2015 Digital Monitoring Products
To program Holiday Dates for a group, the group must first be opened or created. The currently
opened group displays next to Remote Link or System Link in the display above the menu bar. The
Program>Holiday Dates window allows you to enter or make changes to the Holiday Dates information
in the group database file.
To add a new Holiday Date, click on the New button and enter information in each field. To
accept the added information, click on the Apply button at the bottom of the window.
To delete a Holiday Date, select the event from the list on the left side of the window and click
on the Delete button at the bottom of the window.
Number: Assign a number to the holiday date. You may assign up to 20 holiday dates.
Name: Enter up to 16 characters for the name of the holiday. The name does not show up on the
panel, but does appear on reports.
Class: Allows you to assign one of three different schedules to a holiday. Each holiday class assigns a
different schedule to a holiday. Choose A, B, or C from the drop-down menu.
Holiday: Select the date of the holiday from the drop-down calendar.
Description: To enter a note or description regarding the holiday entry you are programming, type
the information in the Description field or press the Description button to open the Edit Rich Text
window. After you type your note, go to File > Save and Exit to save your work and close the Edit Rich
Text window. Your note appears in the field above the Description button. This information does not
show up on the panel, but does appear on reports.
(Must have Account G ro ups Mo dule to U se)
Program>Output Schedules
Output Schedules allow you to set the times when relay outputs connected to your system turn on and
off automatically.
To program Output Schedules for a group, the group must first be opened or created. The currently
opened group displays next to Remote Link or System Link in the display above the menu bar. The
Program>Output Schedules window allows you to enter or make changes to the Output Schedule
information in the group database file.
To add a new Output Schedule, click on the New button and enter information in each field. To
accept the added information, click on the Apply button at the bottom of the window.
To delete an Output Schedule, select the schedule from the list on the left side of the window