3.0  SUBMITTALS 
3.1 General Requirements 
The contractor shall submit three (3) complete sets of documentation within thirty (30) calendar days after contract 
award date. Indicated in the document shall be the manufacturers’ names, catalog number, type, size, style, rating, 
and catalog data sheets for all items proposed to meet these specifications. 
3.2 Shop Drawings 
Shop drawings shall be submitted in accordance with Section 3.0 Submittals and shall consist of a complete list of 
equipment and materials, including manufacturer’s descriptive and technical literature, performance charts and 
curves, catalog cuts, and installation instructions. 
3.3 As-Built Drawings 
The contractor shall provide a complete set of as-built drawings for the entire system upon installation completion. 
These drawings shall include, but not be limited to, the exact locations of all equipment, connections between all 
equipment, and wiring for all equipment as the system is installed. 
3.4 Spare Parts Data 
After shop drawings are approved, and not later than thirty (30) calendar days prior to the date of beneficial 
occupancy, a list of spare parts data for each item of specified materials and equipment shall be submitted. The 
data shall include a complete list of parts and supplies with current unit prices and source of supply. Spare parts 
shall consist of, but not be limited to, five (5) percent of all initiating and notification appliances with a minimum of 
one (1) each. All spare parts shall be on site prior to commencement of acceptance testing. Depleted spare parts 
shall be replaced prior to beneficial occupancy. 
3.5 Operating Documents 
The contractor shall furnish to the architect operating instructions outlining the step-by-step procedures required for 
system start-up, operation, and shutdown at least thirty (30) calendar days prior to acceptance test. The instructions 
shall include the manufacturer’s name, system model number, service manual, parts list, and a description of all 
equipment and their basic operating features. 
3.6 Maintenance Documents 
The contractor shall furnish maintenance instructions listing routine maintenance procedures, possible breakdowns 
and repairs, and troubleshooting guides at least 30 calendar days prior to acceptance test. 
3.7 Performance Test Reports 
Upon the installed system completion and testing, test reports shall be submitted in booklet form showing all field 
tests performed to prove compliance with specified performance criteria. 
3.8 Warranty 
A copy of the manufacturer’s warranty for all equipment and materials shall be provided. Warranty shall be for all 
equipment, materials, installation, and workmanship for a minimum of three (3) years, unless otherwise specified. 