3.3.2.9 CALENDAR FUNCTION
The Calendar function is used to define if a function or a single event is active or not in the selected
period of time.
Therefore the Calendar is suitable to include/exclude certain period of the day, month or year when it
has to interact with some XWEB 3000 procedures or for instance if the maintenance personnel is
working on the unit.
The resource (or any programmed procedure that the XWEB 3000 has to follows) related to a
Calendar is available “Enabled” only during the selected periods otherwise it is “Disabled” and it does
not work.
The XWEB 3000 use the Calendar as filter before activating the resource itself, if the resource is not
enabled in that period nothing happens.
The alarm procedure to inform an Assistance Centre or the light on function can be override by their
appropriate Calendar programming.
The number of Calendars is not limited and each Calendar can manage more than one resource.
The Calendar is based on a weekly list extended for all the month, the tile colour shows the function
related to that day
The day are divided in:
Enabled Æ Green colour;
Partly Enabled Æ Yellow colour;
Disabled Æ Grey colour.
Disabled day represent the 24 ore where the resource is not active (e.g. holiday).
Enabled and Partly Enabled days can accept the period of activity of the resource.
Setting the daily period activity for all the week
(Eg: define Saturday and Sunday as Disabled, Wednesday as Partly Enabled).
Select the appropriate month:
Point the mouse arrow on the rose tile “Saturday”.
Click with the left button and then set the value as “Weekly not Enabled”. The tiles become Grey.