Instruction manual

XWEB 500 – rel.1.0
The XWEB 500 use the Calendar as filter before activating the resource itself, if the resource is not Enabled
in that period nothing happens.
The alarm procedure to inform an Assistance Centre or the light on function can be override by their
appropriate Calendar programming.
The number of Calendars is not limited and each Calendar can manage more than one resource.
The Calendar is based on a weekly list extended for all the month, the tile colour shows the function related
to that day
The day is divided in:
Enabled Green colour;
Partly Enabled Yellow colour;
Disabled Grey colour.
Disabled day represent the 24 ore where the resource is not active (eg holiday).
Enabled and Partly Enabled days can accept the period of activity of the resource.
Setting the daily period activity for all the week
(Eg: define Saturday and Sunday as Disabled, Wednesday as Partly Enabled).
Select the appropriate month:
Point the mouse arrow on the rose tile “Saturday”.
Click with the left button and then set the value as “Weekly not Enabled”. The tiles become Grey.
44/103 10/01/2006 - 1592010900