User's Guide
Table Of Contents
- General Safety
- Hardware
- Network Design
- Installation and Configuration
- Install Battery
- Configure Network
- VP Series 2000 Configuration Software
- Provision Devices
- Before you Begin
- Device Sleep State
- Provision Using a USB NFC Reader
- Provision Using a Divigraph ISA100 Gateway
- Provision Using a Yokogawa ISA100 Gateway
- Provision Using a Honeywell ISA 100 Gateway
- Provision using an Emerson WirelessHART Gateway
- Unprovision Devices
- Unprovision Using a USB NFC Reader
- Unprovision Using a Yokogawa ISA100 Gateway
- Unprovision Using a Honeywell ISA100 Gateway
- Reboot the Device
- Configure Devices
- System 1 Installation and Configuration
- Mount Devices
- Verification
- Maintenance
- Monitor Battery Levels
- Battery Status Monitoring
- Clean and Inspect Devices
- Update Device Firmware
- Update Radio Firmware
- Troubleshooting VP Series 2000 Devices
- Harden the System
EVR-VPXDOC-0036 VP Series 2000 User Guide
DIVIGRAPH
Rev 2.4.1
September 2021
Proprietary & Confidential – Copyright © 2020 Divigraph (Pty) Ltd. All Rights Reserved 31
3. Determine what kind of mount you want to use.
a. We recommend you drill and tap a mounting hole.
• Verify that the machine housing is suitable for drilling a mounting hole.
• Refer to the machine warranty or other documentation.
• Consider the type of VP Series 2000 device you want to mount.
• Consider placement on the machine relative to its axis.
b. If drilling a mounting hole is not feasible, use an adhesive mounting pad instead.
See "About Using Adhesives".
c. Select either a standard stud, adhesive stud, or tri-axial alignment stud available from
Divigraph.
Prepare the Mounting Point
To prepare the mounting point to which a VP Series 2000 device is attached:
1. Prepare the mounting surface.
a. The mounting diameter should be a minimum of 40mm (1 ½ inches) on the machine at the
mounting point.
b. Use a steel wire brush to remove all paint from the mounting surface.
c. On curved or uneven surfaces, use a spot facing tool to provide a flat mounting surface.
2. Prepare the attachment point.
a. (Recommended) Drill and tap a suitable hole in the center of the prepared surface,
perpendicular to the mounting surface.
b. (Alternative) Cement an adhesive mounting pad onto the prepared surface with a suitable
bonding agent. See "About Using Adhesives".
For machine manufacturers or when installing in a suitable environment, the surface finish for stud
mounted devices should meet the following specifications:
• Roughness: 32 microinch rms
• Flatness: 0.001” TIR
• Spotface Diameter: 1.5 inch
• Hole Perpendicularity: +/- 1 °
• Hole Depth: mounting stud dependent
! Note
The mounting point hole and thread depth should be sufficient for the mounting stud to be seated
against the prepared mounting surface.