Owner`s manual

2
O ptima FX Owner’s Manual
Ch. 6 Pg. 5
Copyright, Dive Rite All Rights Reserved January 2009
Re-inspect o-rings on end-cap and on the water trap for debris and
damage. Verify that the water trap is properly installed into the end-
cap. Lubricate the canister o-ring surface. Place the end-cap assembly
onto the open end of the center tube and rotate until the cap slips into
place. Rotate the end cap clockwise until the arrow on the end-cap
lines up with the locked indication on the center tube. Secure the
assembled canister to the top of the mounting plate using the elastic strap. It is necessary to stretch
the strap in order to thread the buckle. The strap should be pulled tight enough to prevent the
canister from sliding.
D S V
The DSV comes from the factory with the mushroom valves installed and the DSV attached to the
hoses. The diver needs to install a mouthpiece on the DSV. The mouthpiece is fitted over the
opening on the DSV and secured in place with the supplied wire tie.
Part of the normal pre-dive inspection is to insure that the directional mushroom valves are
operating correctly (Failure of either mushroom valve must be corrected before diving) but
periodic visual inspection is highly recommended. The valves are accessed by loosening the hose
clamps and removing the hose. The valves can now be removed for inspection an/or replacement.
IMPORTANT, the valves are directional, proper positioning must be observed. Gas must flow
from the diver’s left to the diver’s right, the gas flow direction is indicated by an arrow inscribed
across the length of the DSV. The hose connected on the inhalation side must be the long hose
with the RED connector.