Operation Manual

- 38 -
0DT829 15/10/2012
6. CHECKING AND STARTING
6.1 Check of the movement direction
Move the panel until it reaches half-way with respect to its stroke.
Open and close the door by pressing the relative push-buttons, and check the correct movement direction.
If required, reverse the movement direction by modifying the sequence of the phase and acting on the line cable before
the main switch.
6.2 Cable safety edge adjustments
Screw until micro switch trips, and then loosen a 1/2 turn. Block the contact 
20