Installation manual

GB
12
CUBIC6 - IP1812
Allrightreserved
All data and specications have been drawn up and checked with the greatest care. The manufacturer cannot however take any
responsibility for eventual errors, ommisions or incomplete data due to technical or illustrative purposes.
4. ELECTRICAL CONNECTIONS
Attention: the electrical connections for the extension of the motor cables must be made on the outside of the foundation casing
in an appropriate junction box (not supplied).
The CUBIC6 gearmotor can be connected to the E2 and LOGICM control panels. The CUBIC6J gearmotor can be connected to
the E2J and LOGICMJ control panels. The CUBIC6H and CUBIC6VH gearmotors can be connected to the VIVAH control panel.
The electrical connections and the start-up of the gearmotors are shown in the installation manuals of the E2, LOGICM and VIVAH
control panels.
5. MAINTENANCEPROGRAM(every6months)
Without 230 V~ power supply and batteries if present:
- Lubricate the levers of the gearmotor.
- Lubricate the rotation pivot of the gate leaf.
- Lubricate the gate leaf hinges.
- Check the good conditions of the electric connection.
- Check that the xing screws of the gearmotor are rmly tightened.
- Clean the inside of the cases and check that drain is not clogged.
- Check the value of the capacity of the motor condenser.
Reconnect the 230 V~ power supply and batteries if present:
- Check the power adjustment.
- Check the good operation of all command and safety functions (photocells).
- Check the good operation of the release system.
ATTENTION: For spare parts, see the spares price list.