User Manual

Push Rods - 50 P80/PP25 Operator’s Manual
Assemble Strike System
CMW
Assemble Bonding Equipment
1. Drive voltage stake into ground at least 6 ft (2 m) from
starting trench.
2. Clip voltage limiter to voltage stake.
3. Connect cable from voltage limiter to back of control
box and lock with 1/4 turn.
4. Connect bonding cables to grid mats.
5. Drive ground rod into soil near grid mats.
6. Move cords and cables under grid mats.