Owner manual

JT60/JT60 All Terrain Operator’s Manual Prepare - 75
Plan Bore Path
JT60 Power Pipe AT
Minimum depth (D) Entry pitch (A) Setback (B) Depth to begin steering (S)
5’ 4” 18”/10.0° 47’ 12” 2’ 3”
6’ 2” 19%/11.0° 51’ 6” 2’ 5”
7’ 2” 21%/12.0° 54’ 11” 2’ 8”
8’1” 23%/13.0° 58’ 5” 2’ 10”
9’ 2” 25%/14.0° 61’ 10” 3’ 1”
10’ 3” 27%/15.0° 65’ 3” 3’ 4”
11’ 5” 29%/16.0° 68’ 7” 3’ 6”
IMPORTANT: Numbers in table based on 168.7’ (51.4 m) minimum bend radius, beacon housing, EZ-
Connect, connector, transition sub, and 1/3 of first drill pipe (L, totaling 12’ 10” [3.9 m]) in the ground
before steering.