Owner manual
Prepare - 74 JT60/JT60 All Terrain Operator’s Manual
Plan Bore Path
JT60 Power Pipe Forged
Minimum depth (D) Entry pitch (A) Setback (B) Depth to begin steering (S)
4’ 10” 18”/10.0° 41’ 12” 2’ 3”
5’ 7” 19%/11.0° 44’ 10” 2’ 6”
6’ 5” 21%/12.0° 47’ 9” 2’ 8”
7’ 3” 23%/13.0° 50’ 6” 2’ 11”
8’ 2” 25%/14.0° 53’ 4” 3’ 2”
9’ 1” 27%/15.0° 56’ 2” 3’ 4”
10’ 1” 29%/16.0° 58’ 11” 3’ 7”
IMPORTANT: Numbers in table based on 168.7’ (51.4 m) minimum bend radius, beacon housing, EZ-
Connect, connector, transition sub, and 1/3 of first drill pipe (L, totaling 12’ 10” [3.9 m]) in the ground
before steering.