Planning
Planning
1. Gather information about jobsite. See page 61.
2. Inspect jobsite. See page 62.
3. Classify jobsite. See page 64.
4. Plan bore path. See page 67.
5. Select drilling mode based on jobsite conditions. See page 79.
6. Check supplies and prepare equipment. See page 77.
7. Load equipment. See page 89.
Setting Up at Jobsite
1. Prepare jobsite. See page 76.
2. Unload drilling unit from trailer. See page 91.
3. Assemble drill string. See page 99.
4. Position drilling unit and frame. See page 95.
5. Assemble strike system. See page 123.
6. Anchor drilling unit. See page 119.
7. Connect fluid system. See page 95.
8. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.