Owner manual
Systems and Equipment - 152 JT60/JT60 All Terrain Operator’s Manual
Pipe Boxes
Remove Single Pipe
Unload all drill pipe loaded with auxiliary pipe
loaders. Pipe in fourth row of pipe box can be
unloaded only when all other rows are empty.
1. Ensure shuttle stop is fully lowered.
2. Move shuttles out fully.
3. Pull and hold pins (1) on each shuttle and
slide out auxiliary pipe loaders (2).