Owner manual

Systems and Equipment - 150 JT60/JT60 All Terrain Operator’s Manual
Pipe Boxes
Add Single Pipe
1. Position additional drill pipe box near machine.
2. Ensure shuttle stop is fully lowered.
3. Move shuttles out fully.
4. Stop drilling.
5. Pull and hold pins (1) on each shuttle and
slide out auxiliary pipe loaders (2).
6. Remove pipe stop (stored on outside of drill
frame) and attach to front of pipe box.