JT20 Operator’s Manual Operation Overview - 23
Drilling
CMW
®
Drilling
1. Start system. See page 90.
2. Engage tracker control if desired. See page 123.
3. Drill first pipe. See page 95.
4. Record bore path. See page 102.
5. Enable automated pipeloader system. See page 95.
6. Add pipe. See page 96.
7. Drill remaining pipes in pipe box.
Correct direction. See page 98.
Engage cruise control. See page 142.
Shift pipe box. See page 137.
8. Add up to a single column of drill pipe to empty box (see page 137) to complete bore.
9. Surface drill head. See page 102.