User Manual
Operation Overview - 22 JT20 Operator’s Manual
Planning
CMW
®
Planning
1. Gather information about jobsite. See page 61.
2. Inspect jobsite. See page 62.
3. Classify jobsite. See page 64.
4. Plan bore path. See page 66.
5. Check supplies and prepare equipment. See page 72.
6. Load equipment. See page 80.
Setting Up at Jobsite
1. Prepare jobsite. See page 71.
2. Unload drilling unit from trailer. See page 83.
3. Assemble drill string. See page 93.
4. Position drilling unit and drill frame. See page 89.
5. Assemble strike system. See page 113.
6. Anchor drilling unit. See page 111.
7. Connect fluid system. See page 89.
8. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.