User Manual

JT20 Operator’s Manual Contents - 9
CMW
®
Contents
Overview
machine serial number, information about the type of work this machine is designed
to perform, basic machine components, and how to use this manual
1
Foreword
part number, revision level, and publication date of this manual, and factory contact
information
7
Safety
machine safety alerts and emergency procedures
11
Controls
machine controls, gauges, and indicators and how to use them
25
Operation Overview
an overview for completing a job with this machine: planning, setting up, installing
product, and restoring the jobsite; with cross references to detailed procedures
21
Prepare
procedures for inspecting and classifying the jobsite, planning the installation path,
and preparing the jobsite for work
59
Drive
procedures for startup, cold start, driving, and shutdown
75
Transport
procedures for lifting, hauling, and towing
79
Conduct a Bore
procedures for drilling and backreaming
87
Systems and Equipment
downhole tools and drill pipe, anchor, electric strike, tracker control, and fluid
systems
109
Complete the Job
procedures for restoring the jobsite and rinsing and storing equipment
151
Service
service intervals and instructions for this machine including lubrication, replacement
of wear items, and basic maintenance
155