Owner's manual

Operation Overview - 62 JT1220 Mach 1 Operator’s Manual
Leaving Jobsite
CMW
Leaving Jobsite
1. Remove downhole tools. See page 113.
2. Remove anchors. See page 117.
3. Rinse unit and downhole tools. See page 158.
4. Disassemble strike system and disconnect from fluid system. See page 159.
5. Stow tools. See page 159.
6. Load unit onto trailer. See page 86.
Storing Equipment
1. For cold weather storage, antifreeze drilling unit. See page 156.
2. For long-term storage, disconnect battery disconnect switch.