Operation Overview - 60 JT1220 Mach 1 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 65.
2. Inspect jobsite. See page 66.
3. Classify jobsite. See page 68.
4. Plan bore path. See page 71.
5. Check supplies and prepare equipment. See page 77.
6. Load equipment. See page 83.
Setting Up at Jobsite
1. Prepare jobsite. See page 76.
2. Unload drilling unit from trailer. See page 89.
3. Assemble drill string. See page 99.
4. Position drilling unit and frame. See page 95.
5. Assemble strike system. See page 118.
6. Anchor drilling unit. See page 117.
7. Connect fluid system. See page 95.
8. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.