JT100/JT100 All Terrain Operator’s Manual Prepare - 87
Plan Bore Path
CMW
©
Pipe-By-Pipe Bend Limits - Power Pipe
®
Forged
Pipe
(C)
Forward (B) Deflection (A) Pipe
(C)
Forward (B) Deflection (A)
1 0 ft 7 in (0.2 m) 14 ft 12 in (4.6 m) 12 76 ft 8 in (23.4 m) 155 ft 12 in (47.5 m)
2 2 ft 3 in (0.7 m) 29 ft 11 in (9.1 m) 13 88 ft 11 in (27.1 m) 164 ft 8 in (50.2 m)
3 5 ft 1 in (1.6 m) 44 ft 7 in (13.6 m) 14 101 ft 9 in (31 m) 172 ft 5 in (52.6 m)
4 9 ft 1 in (2.8 m) 59 ft 1 in (18 m) 15 115 ft 1 in (35.1 m) 179 ft 2 in (54.6 m)
5 14 ft 1 in (4.3 m) 73 ft 2 in (22.3 m) 16 128 ft 12 in (39.3 m) 184 ft 11 in (56.4 m)
6 20 ft 2 in (6.2 m) 86 ft 11 in (26.5 m) 17 143 ft 3 in (43.7 m) 189 ft 6 in (57.8 m)
7 27 ft 4 in (8.3 m) 100 ft 1 in (30.5 m) 18 157 ft 10 in (48.1 m) 193 ft 1 in (58.8 m)
8 35 ft 5 in (10.8 m) 112 ft 9 in (34.4 m) 19 172 ft 7 in (52.6 m) 195 ft 6 in (59.6 m)
9 44 ft 6 in (13.6 m) 124 ft 8 in (38 m) 20 187 ft 7 in (57.2 m) 196 ft 9 in (59.9 m)
10 54 ft 8 in (16.6 m) 135 ft 11 in (41.4 m) 21 197 ft 0 in (60 m) 197 ft 0 in (60 m)
11 65 ft 2 in (19.9 m) 146 ft 4.5 in (44.6 m)
Pipe 10 is illustrated.