Manual
Prepare - 86 JT100/JT100 All Terrain Operator’s Manual
Plan Bore Path
CMW
©
Pipe-By-Pipe Bend Limits - Power Pipe
®
Pipe
(C)
Forward (B) Deflection (A) Pipe
(C)
Forward (B) Deflection (A)
1 14 ft 9 in (4.5 m) 0 ft 6 in (0.2 m) 12 155 ft 11 in (47.5 m) 71 ft 11 in (21.9 m)
2 29 ft 5 in (9.0 m) 2 ft 1 in (0.6 m) 13 165 ft 1 in (50.3 m) 83 ft 6 in (25.4 m)
3 43 ft 11 in (13.4 m) 4 ft 9 in (1.5 m) 14 173 ft 5 in (52.9 m) 95 ft 8 in (29.2 m)
4 58 ft 3 in (17.8 m) 8 ft 5 in (2.6 m) 15 180 ft 10 in (55.1 m) 108 ft 5 in (33.1 m)
5 72 ft 3 in (22 m) 13 ft 2 in (4.0 m) 16 187 ft 4 in (57.1 m) 121 ft 8 in (37.1 m)
6 85 ft 10 in (26.2 m) 18 ft 10 in (5.7 m) 17 192 ft 10 in (58.8 in) 135 ft 5 in (41.3 m)
7 99 ft 0 in (30.2 m) 25 ft 6 in (7.8 m) 18 197 ft 4 in (60.1 m) 149 ft 5 in (45.6 m)
8 111 ft 8 in (34 m) 33 ft 1 in (10.1 m) 19 200 ft 10 in (61.2 m) 163 ft 9 in (49.9 m)
9 123 ft 9 in (37.7 m) 41 ft 7 in (12.7 m) 20 203 ft 3 in (62.0 m) 178 ft 4 in (54.4 m)
10 135 ft 2 in (41.2 m) 50 ft 11 in (15.5 m) 21 204 ft 8 in (62.4 m) 193 ft 0 in (58.8 m)
11 145 ft 11 in (44.5 m) 61 ft 0 in (18.6 m) 22 205 ft 0 in (62.5 m) 205 ft 0 in (62.5 m)
j28om149t.eps
C
1
22
11
B
A
44.5m
145ft. 11in.
18.6m
61ft.
Pipe 11 is illustrated.