Manual
Operation Overview - 72 JT100/JT100 All Terrain Operator’s Manual
Planning
CMW
©
Planning
1. Gather information about jobsite. See page 77.
2. Inspect jobsite. See page 78.
3. Classify jobsite. See page 80.
4. Plan bore path. See page 83.
5. Check supplies and prepare equipment. See page 95.
6. Load equipment. See page 107.
Setting Up at Jobsite
1. Prepare jobsite. See page 94.
2. Unload drilling unit from trailer. See page 109.
3. Assemble drill string. See page 117.
4. Position drilling unit and frame. See page 113.
5. Assemble strike system. See page 146.
6. Anchor drilling unit. See page 135.
7. Connect fluid system. See page 113.
8. Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.