Manual
JT100/JT100 All Terrain Operator’s Manual Controls - 37
Left Control Console
CMW
©
2. Add pipe/manual/
remove pipe switch
To select “add pipe”
automated pipeloader
function, press green part of
switch.
To use manual pipeloader
controls, move to center.
To select “remove pipe”
automated pipeloader
function, press white part of
switch.
See “Add Pipe” on page 122.
See “Remove Pipe” on page 130.
3. Pipe lift switch To lower, press
To raise, press
4. Pipe gripper switch To close, press
To open, press
5. Pipe shuttle switch To move toward pipe
box, press
To move toward spindle,
press
IMPORTANT: Shuttles will not
function unless shuttle guard bar on
outside of pipe box is in operating
position.
6. Front frame tilt switch To lower front of drill
frame, press
To raise front of drill
frame, press
7. Back frame tilt switch To lower rear of drill
frame, press
To raise rear of drill
frame, press
8. Pipe lubricator switch To spray joint compound
on threads at saver sub
and wrenches, press
9. Front wrench clamp
switch
To unclamp, press
To clamp, press
Item Description Notes
c00ic059t.eps