Manual

Transport - 110 JT100/JT100 All Terrain Operator’s Manual
Tow
CMW
©
Tow
Under normal conditions, drilling unit should not be towed. If unit breaks down and towing is necessary:
tow for short distances at less than 1 mph (1.6 km/h),
attach chains to indicated tow points facing towing vehicle,
use maximum towing force of 1.5 times unit weight,
disengage track planetaries.
To disengage track planetaries, reverse small cover plate in center of planetary on each track drive.
A. Normal operation B. Towing
NOTICE: When planetaries are disengaged, unit has no brakes.