Manual
Transport - 110 JT100/JT100 All Terrain Operator’s Manual
Tow
CMW
©
Tow
Under normal conditions, drilling unit should not be towed. If unit breaks down and towing is necessary:
• tow for short distances at less than 1 mph (1.6 km/h),
• attach chains to indicated tow points facing towing vehicle,
• use maximum towing force of 1.5 times unit weight,
• disengage track planetaries.
To disengage track planetaries, reverse small cover plate in center of planetary on each track drive.
A. Normal operation B. Towing
NOTICE: When planetaries are disengaged, unit has no brakes.