Owner manual

Operation Overview - 38 FX50 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite (page 42).
2. Inspect jobsite (page 43).
3. Check supplies and prepare equipment (page 45).
Setting Up at Jobsite
1. Prepare jobsite (page 44).
2. Position vacuum excavation unit.
3. Leave unit hitched to towing vehicle or properly stabilized.
4. Block trailer wheels.
Vacuuming
1. Connect hoses (page 52).
2. Start unit (page 56).
3. Position optional vacuum boom (page 58).
4. Remove debris (page 59).
5. Disconnect hoses (page 71).
6. Drain tank (page 62) or unload to another tank (page 64)