Operation Overview - 34 410sx Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 38.
2. Inspect jobsite. See page 39.
3. Classify jobsite. See page 40.
4. Select plow blade for your installation. See page 75
5. Select chain and teeth to match your soil type, if necessary. See page 76.
6. Check supplies and prepare equipment. See page 42.
7. Haul equipment to jobsite. See page 50.
Plowing
1. Start unit. See page 44.
2. Position tractor and controls. See page 57.
3. Attach product. See page 57.
4. Begin plowing. See page 58.
5. Complete the installation. See page 79.
6. Shut down tractor. See page 45.
Trenching
1. Start unit. See page 44.
2. Position tractor and controls. See page 62.
3. Begin trenching. See page 63.
4. Complete the installation. See page 79.
5. Shut down tractor. See page 45.