Installation Guide

9/10/2019 Installation Guide – Disruptive Technologies
https://support.disruptive-technologies.com/hc/en-us/articles/360003190014-Installation-Guide 17/22
not get through at all. Place more Cloud Connectors until the installation area is su$ciently covered.
For increased reliability, let each sensor reach two or more Cloud Connectors.
Multiple "oors, covering large areas.
When covering building over multiple "oors, consider that placement of a Cloud Connector on one "oor may give some
coverage at the "oor above and below. The coverage will depend on the construction of the building, especially the material of
the "oors. Try placing Cloud Connectors on each "oor shifted horizontally to maximize the signal coverage.
Tools supporting installation and veri!cation