User's Manual
Table Of Contents
- Safety Warnings and Precautions
- Assembly and Connection
- Packing List
- Interfaces
- Remote Control
- Description of Basic Operation
- Power on/Standby
- About Launch Desktop
- Description of Wallpaper Switch
- File Manager
- Local Settings
- Technical Specifications
- Cleaning and Maintenance
- Names and Contents of Toxic and Hazardous Substan
- or Elements in the Product
9
/
26
Cable Management Installation Mode
1. Take out the cord management channel and tear off the surface coating of the bottom adhesive on the back.
Refer to Figure 1.
2. Paste the channel on one of the leg of the table, leaving 25mm space from the top and bottom to let cord
come through, as shown in Figure 2.
(Fig. 1) (Fig. 2)
3. Figure 3 is the reference diagram after the channel has been placed.
4. How to use it
4-1. Open the channel from the side.
4-2. Put the power cord/Ethernet cord in the channel
4-3. Close the channel.
(Fig. 3) (Fig. 4)
4-1
4-2
4-3