Owner manual

IP025-001 V3
IBL Lift Series Installation
07/05 Thor/Sales Info/Installation Materials/IBL Lift
7
PHYSICAL INSTALLATION
TOP-MOUNTING
Top mounting is typically used when installing the lift into a false ceiling (grid tile) or an
exposed unfinished ceiling.
We recommend you install mounting hardware into a structural channel.
Example – Top Mounting
Structural channel provides flexibility for adjusting the lift front-to-rear and side-to-side.
All hardware should be at least in 3/8” (M10) diameter.
You should use angled stabilizers if threaded rods extend 2’ (60 cm) or more
between structural channel and the lift.
You should also leave the threaded rods slightly loose to ease in alignment and
leveling after installing the lift.
You need to make sure all hardware is securely tightened at the end of your
installation.